Basic Bank Assistan Manager -2012

Mathematics

1. A time-study specialist has set the production rate for each worker on a certain job at 22 units every 3 hours. At this rate what is the minimum number of workers that should be put on the job if at least 90 units are to be produced per hour?

[Basic Bank Asst.Manager-2012 : 2012]

1. 12

1

2. 13

2

3. 18

3

4. 30

4

5. None of these

5
Answer
Comments